Skip to content
Alternative Finance

Commercial loans · Brokers and investors

Commercial bridge loan calculator

This bridge loan calculator totals what a short-term, interest-only commercial bridge loan actually costs: interest over the months outstanding, origination points, exit fee, an optional extension fee and closing costs, then expresses the total as an annualized all-in rate and shows the net proceeds after points, legal costs and the interest reserve are held back. It is for brokers and investors comparing a bridge against waiting for permanent financing. Watch the annualized figure: fees that look small per transaction add several points to an already high rate when the loan is short.

Total cost of the bridge
$225,000
Monthly interest-only payment
$13,750.00
Interest over the period
$165,000
Points, exit and extension fees
$45,000
Net proceeds at closing
$1,372,500
Annualized all-in cost
15.0%
Payoff at exit
$1,515,000

Bridge economics are dominated by fees and time: two points in and one out on a twelve-month loan add three percent to an already high rate. The interest reserve reduces cash at closing but is your own money.

Your funding estimate

$1,500,000

Estimated amount from your inputs, about $13,750 per month over 12 months. An example calculation, not an offer from any lender.

Compare funding options

Formula

Monthly interest-only payment = Loan amount × Interest rate ÷ 12; Interest over the period = Monthly interest × Expected months outstanding

Fees = Loan amount × (Origination points + Exit fee + Extension fee if the extension box is checked) ÷ 100 + Legal, appraisal and other closing costs

Total cost of the bridge = Interest over the period + Fees; Annualized all-in cost = Total cost ÷ Loan amount ÷ (Months ÷ 12)

Interest reserve = Monthly interest × Reserve months; Net proceeds at closing = Loan amount − Origination points in dollars − Interest reserve − Closing costs

Payoff at exit = Loan amount + Exit fee in dollars (the reserve, if unused, is credited separately by the lender)

Worked examples

Example 1: $1,500,000 at 11 percent for 12 months, 2 points in, 1 point out, 6-month reserve

Use the defaults: Loan amount $1,500,000, Interest rate 11 percent, Expected months outstanding 12, Origination points 2, Exit fee 1, Interest reserve 6 months, Extension fee 1 percent with the extension box unchecked, Legal and closing costs $15,000. Monthly interest = $1,500,000 × 0.11 ÷ 12 = $13,750. Interest over 12 months = $13,750 × 12 = $165,000. Points and exit = $1,500,000 × (0.02 + 0.01) = $45,000; with legal, Fees = $60,000. Total cost = $165,000 + $60,000 = $225,000. Annualized all-in cost = $225,000 ÷ $1,500,000 ÷ 1 = 15.0 percent, four points above the note rate. Interest reserve = $13,750 × 6 = $82,500. Net proceeds = $1,500,000 − $30,000 − $82,500 − $15,000 = $1,372,500. Payoff at exit = $1,500,000 + $15,000 = $1,515,000. The borrower receives $1,372,500, pays $13,750 a month from the reserve for six months and from cash for six more, and repays $1,515,000 at exit.

Example 2: $800,000 at 12 percent for 18 months with an extension used and no reserve

Enter Loan amount $800,000, Interest rate 12 percent, Expected months outstanding 18, Origination points 2.5, Exit fee 0.5, Interest reserve 0 months, Extension fee 1 percent with the extension box checked, Legal $12,000. Monthly interest = $800,000 × 0.12 ÷ 12 = $8,000. Interest over 18 months = $144,000. Fee percentages = 2.5 + 0.5 + 1 = 4 percent, so $32,000, plus $12,000 legal = $44,000. Total cost = $144,000 + $44,000 = $188,000. Annualized = $188,000 ÷ $800,000 ÷ 1.5 = 15.7 percent. No reserve is held, so Net proceeds = $800,000 − $20,000 − $0 − $12,000 = $768,000. Payoff at exit = $800,000 + $4,000 = $804,000. The extension fee is paid when the borrower exercises the option, usually at month 12; the tool includes it in Total cost because the box is checked. Without the extension the annualized cost on a 12-month hold would have been higher, because fixed fees are spread over fewer months; with it, the extra point is spread over 18.

Example 3: $3,000,000 at 10 percent for 6 months, 1.5 points in, 1 out, 3-month reserve

Enter Loan amount $3,000,000, Interest rate 10 percent, Months 6, Origination points 1.5, Exit fee 1, Reserve 3 months, extension unchecked, Legal $25,000. Monthly interest = $3,000,000 × 0.10 ÷ 12 = $25,000. Interest over 6 months = $150,000. Points and exit = $3,000,000 × 0.025 = $75,000; with legal, Fees = $100,000. Total cost = $250,000. Annualized = $250,000 ÷ $3,000,000 ÷ 0.5 = 16.7 percent, nearly seven points above the 10 percent note rate, because 2.5 points of fees on a six-month hold is five points a year. Reserve = $75,000. Net proceeds = $3,000,000 − $45,000 − $75,000 − $25,000 = $2,855,000. Payoff = $3,030,000. A lower note rate did not make this the cheapest bridge of the three; the short hold did the opposite.

What a bridge loan is, and why the fees matter more than the rate

A commercial bridge loan is short-term, usually interest-only, secured by real estate or business assets, and made to cover the gap between an event that needs funding now, such as a purchase closing, a maturing loan or a renovation, and a later event that repays it, such as a sale, a lease-up or a permanent loan. Terms of six to twenty-four months are common, with one or two extension options. Because the loan is short, the economics are dominated by fixed charges: origination points, exit fees, legal and appraisal costs and extension fees. A point on a 12-month loan is one percent a year; the same point on a 6-month loan is two percent a year. This bridge loan calculator annualizes everything so a quote at 10 percent with 3 points can be compared honestly with a quote at 12 percent and 1 point.

Bridge lenders are mostly non-bank: private debt funds, family offices, specialty finance companies and individuals. They price for speed, for collateral that banks will not yet lend on and for borrowers whose financials are not yet bankable. Wikipedia's bridge loan entry summarizes the structure; the alternative bridging finance page covers the market in more depth. Rates run well above bank rates and the annualized cost after fees is higher still, which is why the exit plan, not the rate, is the first thing an experienced broker asks about.

Reading the outputs: proceeds, cost and the payoff

What each output means in cash terms
OutputCash meaningWhen it matters
Net proceeds at closingMoney actually wired to the borrower after points, reserve and costsSizing the loan: you must borrow more than you need to receive what you need
Monthly interest-only paymentPaid monthly from the reserve first, then from the borrower's cashCash flow planning during the hold
Interest reserveBorrower's own money held by the lender to make the first paymentsReduces proceeds; unused reserve is credited at payoff
Points, exit and extension feesLender's charges beyond interestThe part of cost that does not fall if you exit early
Total cost of the bridgeInterest plus all fees over the expected holdCompare with the cost of not bridging
Annualized all-in costTotal cost as a yearly rate on the loanCompare quotes with different rates, points and holds
Payoff at exitPrincipal plus exit feeThe number the take-out financing must cover

The annualized cost is a simple rate: total cost divided by loan amount divided by years. It is not an APR in the Truth in Lending sense, because it does not discount for the timing of the reserve or the fees, and business-purpose credit is exempt from federal APR disclosure in any case. The tool flags any annualized figure above 18 percent as a warning, not because 18 percent is a rule but because above it a bridge is rarely cheaper than the alternative it is meant to avoid. Compare on the same footing with the business loan rate comparison tool, and for an exact APR with fees use the business loan APR calculator.

Net proceeds is the figure most often underestimated. In example 1 a $1.5 million loan delivers $1,372,500. A borrower who needs $1.4 million to close must borrow about $1.53 million, which raises the points and the interest and the reserve in turn. The interest reserve is the borrower's own money, taken from proceeds and used to make the early payments; it protects the lender from a missed payment during a renovation and it is credited back if the loan repays early. It is not a fee, but it is cash the borrower does not get to use.

The exit: the only thing that makes a bridge safe

A bridge loan is repaid by an event, and the event has to be realistic within the months entered. The three common exits are a sale of the collateral, a refinance into a permanent loan, and a capital event such as a partner buy-in or an insurance or litigation recovery. Each should be tested against the Payoff at exit figure. A refinance exit must clear a permanent lender's LTV and DSCR at the rates of that day; run the payoff through the commercial mortgage calculator at a conservative value and a rate a point higher than today's. A sale exit must clear the payoff after selling costs. An SBA exit, for owner-occupied property, must survive the SBA loan qualification checker and the program's timeline, which is measured in months.

  1. 1

    Set the months honestly

    Enter the months the exit will actually take, not the term the lender offers. Appraisal, environmental, legal and underwriting on a permanent loan commonly run several months; lease-up of vacant space often runs a year.

  2. 2

    Check the extension box if the exit is uncertain

    If there is a real chance of running past the term, model the extension fee and the extra months now. An unplanned extension is the most common way a bridge becomes a problem.

  3. 3

    Confirm the take-out lender in writing before closing

    A term sheet or at least a written indication from the permanent lender turns the exit from a hope into a plan.

  4. 4

    Size the reserve to the gap

    If the property produces no income until the exit, the reserve should cover the whole hold; if it produces partial income, size the reserve to the shortfall.

  5. 5

    Keep the borrower bankable

    Tax filings, financial statements and the property's reporting must be current when the permanent lender looks, because that is what converts the bridge into a loan with a lower rate.

Contract terms that change the cost

  • Minimum interest: many bridge notes guarantee the lender a minimum number of months of interest, commonly three to six, regardless of early payoff; an early sale does not reduce the cost below that floor.
  • Prepayment: some notes are open after a lock-out period, others charge a fee; read it before planning a quick exit.
  • Default interest: a stepped-up rate after a missed payment or a maturity default, often several points above the note rate, which is why running past maturity without an agreed extension is expensive.
  • Extension conditions: the option usually requires the loan to be current, the collateral to re-appraise at a minimum LTV and the extension fee to be paid in cash.
  • Recourse and guarantees: most bridge loans are full recourse with personal guarantees, and some include a confession of judgment where state law permits; see the confession of judgment and personal guarantees guide.
  • Cross-collateralization: additional property pledged to reach the lender's LTV, which puts assets beyond the project at risk.
  • Holdbacks and draws: renovation funds held by the lender and released against inspections, with interest charged on the full loan from day one in some structures and on drawn funds in others.

Because business-purpose loans are outside federal consumer credit protections, the note is the only protection the borrower has. Several states, including California through the DFPI and New York through the DFS, require commercial financing disclosures on smaller transactions, and some license commercial lenders and brokers; larger bridge loans often fall above the disclosure thresholds, which makes the broker's own cost summary, such as the output of this calculator, the borrower's main disclosure.

When a bridge is the right answer, and when it is not

A bridge earns its cost when the alternative is worse: losing a purchase deposit, defaulting on a maturing loan, missing a discounted payoff, or leaving a building vacant while a permanent lender takes four months. In those cases $225,000 of cost on a $1.5 million bridge, as in example 1, is measured against a larger loss. It is the wrong answer when it is used to fund an operating shortfall with no event that repays it, when the exit depends on a value increase that has not happened yet, or when the annualized cost exceeds the return the money will earn. The commercial loan calculator shows what the same money costs on a term structure, and the business financing product matcher scores the alternatives for a business-purpose need.

Investors who fund bridge loans are taking real estate credit risk at a high yield, and the SEC's investor education site describes the private-offering rules that govern how many bridge funds raise capital. A borrower who understands that the lender's capital is expensive and short-dated understands why the fees are structured the way they are, and can negotiate the ones that matter: the exit fee on a reliable exit, the minimum interest on a quick sale, and the extension fee when the plan already includes an extension.

Questions people ask

How much does a commercial bridge loan cost?

Interest at a rate well above bank rates, plus origination points, often an exit fee, legal and appraisal costs, and an extension fee if the loan runs long. The calculator totals these and annualizes them; on a $1.5 million, 12-month bridge at 11 percent with 2 points in and 1 out, the total is $225,000 and the annualized all-in cost is 15.0 percent.

What is an interest reserve on a bridge loan?

A portion of the loan proceeds the lender holds back to make the first months of interest payments, commonly three to twelve months. It is the borrower's own money, it reduces net proceeds at closing, and any unused portion is credited at payoff. It exists so the lender is paid during a renovation or lease-up when the property produces no income.

Why is the annualized cost higher than the interest rate?

Because points and fees are charged once but the loan is short. Three points of fees on a twelve-month loan add three percent to the annual cost; on a six-month loan they add six. The calculator divides total cost by loan amount and by the fraction of a year outstanding, so a 10 percent note with 2.5 points over six months shows an annualized cost near 17 percent.

Is a bridge loan calculator the same as an APR calculator?

No. The annualized all-in cost here is a simple rate: total cost over the hold divided by loan amount and years. It does not discount for when the fees and reserve are paid, and it is not a regulatory APR, since business-purpose credit is exempt from federal APR disclosure. For a discounted APR including fees use the business loan APR calculator.

What happens if I cannot exit the bridge on time?

If the note has an extension option and its conditions are met, you pay the extension fee and continue; check the box in the calculator to see the cost. If not, the loan is in maturity default, default interest applies and the lender can enforce against the collateral and the guarantors. Plan the exit with a written take-out indication before closing, and model the extension if the timeline is uncertain.

Sources and further reading

Related tools and guides

More commercial loans

Updated October 12, 2026 · By Alternative Finance editorial team

Next step

Turn the estimate into real offers

One request, several funding partners, side-by-side payback. Nothing is binding until you accept an offer.

  • Soft inquiry to request offers; a hard pull only if you proceed with a funder.
  • Decisions in as little as 24 hours for many products; funding often within days.
  • Use our calculators to check the true cost before you accept anything.

Check commercial real estate loans offers

Takes about a minute. Requesting offers does not affect your credit score. Free, no obligation.

We are not a lender or broker. Requests are forwarded to funding partners free of charge. How the site is paid.