What manufacturing usually fund
- CNC, presses, robotics and tooling
- Raw materials for large orders
- Receivables from net-30/60 customers
- Facility expansion
Industry
Manufacturers combine equipment financing for machinery, factoring or asset-based lending for receivables and inventory, and SBA or bank loans for facilities. Because production runs are funded months before payment, cash-flow products matched to the order cycle beat short-term loans with weekly debits.
| Product | Why it fits |
|---|---|
| Equipment financing | 5 – 7 year terms on production equipment, often 100% financed. |
| Invoice factoring | Advances on purchase orders and invoices to large customers. |
| SBA loans (7(a), 504, microloans) | 504 loans for buildings and heavy equipment with 10% down. |
| Business line of credit | Raw materials between orders and payments. |
An SBA 504 structure with 10% down usually lands at a lower blended rate; run the SBA calculator.
A manufacturer pays for raw materials, labor and overhead weeks or months before a customer pays for the finished goods, and the cash conversion cycle measures the gap. If raw materials sit 40 days, work-in-process and finished goods another 35, customers pay 55 days after invoice and suppliers extend 30 days, the cycle is 40 plus 35 plus 55 minus 30, or 100 days. At $20,000 a day of cost of goods sold, about $2,000,000 is permanently invested in the cycle, and every 10% of growth needs another $200,000 before a dollar of extra profit arrives. That is why manufacturers rely on asset-based lending rather than cash-flow products: the money is in receivables and inventory, and the lending is against them.
An asset-based line advances against a borrowing base. Take $900,000 of receivables, from which the lender removes ineligibles: invoices over 90 days, the portion of any customer above a concentration limit, foreign receivables without insurance, contras where the customer is also a supplier, and affiliates. If $150,000 is ineligible, eligible receivables are $750,000 and an 85% advance rate gives $637,500. Inventory of $600,000 at cost with a 50% advance rate on eligible raw materials and finished goods, and nothing on work-in-process, adds $300,000. Availability is $937,500, less the $600,000 already drawn, leaving $337,500 to borrow. The borrowing base is recalculated monthly or weekly from reports you certify, and the lender audits them in field exams.
Seasonality in manufacturing follows the customers' industries: building products peak with construction, consumer goods with retail's fourth quarter, agricultural equipment with planting. Public data lenders use for context includes the Census Bureau's M3 survey of manufacturers' shipments, inventories and orders and the BLS manufacturing page. A backlog report that shows orders growing while shipments lag is read as a capacity constraint, which is a reason to finance equipment; one that shows orders shrinking is a reason to reduce the line before the lender does.
Full version with instructions: working capital calculator.
An asset-based lender files a blanket UCC-1 on all business assets. An equipment lender financing a specific machine can still take priority on that machine through a purchase-money security interest, provided it files within the window the Uniform Commercial Code allows after you take possession, which is 20 days for equipment under Article 9. That rule lets a manufacturer keep its receivables line with one lender and finance a press with another; the mistake is letting the equipment lender file a blanket lien instead of a PMSI limited to the machine, which then conflicts with the line and forces an intercreditor negotiation or a payoff.
Asset-based agreements contain operating clauses that general borrowers never see. Dominion of funds means customer payments go to a lockbox the lender controls and are applied to the loan before you can draw again. Dilution measures credits, returns and disputes against invoices; dilution above the lender's assumption cuts the advance rate. Field exams are periodic audits of your receivables, inventory and books at your cost. Availability blocks and springing covenants reduce what you can borrow or trigger covenants when availability drops below a threshold. Customer-owned tooling and consigned materials are excluded from inventory, and a lender will ask which dies, molds and fixtures belong to customers.
| Source | Advances against | Typical structure | Watch for |
|---|---|---|---|
| Asset-based line | Receivables and inventory | Revolving; borrowing base; lockbox | Field-exam fees, dilution, concentration limits |
| Factoring | Receivables only | Sale of invoices; notice to customers | Customers' credit decides; recourse terms |
| Purchase-order financing | Confirmed orders for finished goods | Pays the supplier; repaid from the customer | Only for goods you resell, not goods you fabricate |
| Equipment financing | Specific machines | 5 to 7 years; PMSI on the machine | Blanket liens that conflict with the line |
| SBA 504 | Buildings and heavy machinery | Bank 50%, CDC 40%, borrower 10% | Long close; owner-occupancy rules |
| SBA 7(a) and Export Working Capital | Working capital, acquisitions, export orders | Guaranteed loans through banks | Equity injection; personal guarantees |
| Export credit insurance | Foreign receivables | Insurance that makes them eligible | Policy conditions on buyer limits |
Invoice factoring
Sell unpaid B2B invoices for an immediate advance of 70% – 95% of their value.
Equipment financing
Loans or leases where the equipment itself is the collateral.
SBA loans (7(a), 504, microloans)
Government-guaranteed loans with the lowest rates and longest terms available to small businesses.
Business line of credit
Revolving credit you draw from as needed and pay interest only on what you use.
Financed 100% over 84 months at an illustrative 8.5%, the payment is about $3,953 a month. If the machine adds 60 productive hours a week at a contribution of $45 an hour after materials and direct labor, it earns about $11,700 a month, roughly three times the payment, before downtime and setup. The equipment lender files a PMSI on the press; the asset-based lender keeps its blanket lien on everything else. The first-year deduction rules in IRS Publication 946 can shift a large part of the cost into the year the press is placed in service, which matters for the tax estimate the lender uses in its coverage test.
Materials of $450,000 must be bought on day one; production takes 60 days; the customer pays 60 days after delivery. Supplier terms cover $150,000 for 30 days; the asset-based line covers nothing until the goods are finished and invoiced, since work-in-process is excluded. The gap is roughly $300,000 for about 120 days. Options are a deposit from the customer, which is the cheapest; purchase-order financing if the goods are resold rather than fabricated; a term bridge; or a temporary over-advance on the line, which lenders grant against a specific order with a confirmed purchase order and a credit check on the buyer. The 2% discount some suppliers offer for payment in 10 days is worth about 37% annualized, so taking it on a line at 10% is profitable.
If one customer is 40% of receivables and the lender's concentration limit is 25%, the excess 15% is ineligible. With $900,000 of receivables, $135,000 drops out of the base, reducing availability by about $115,000 at an 85% advance rate. The remedies are credit insurance on that customer, a higher limit negotiated for investment-grade buyers, or diversification. A lender's concentration limit is not a judgment on the customer; it is a limit on how much of the lender's collateral depends on one payer.
Full version with instructions: roi on capital calculator.
Covenants on manufacturing credit are usually a minimum fixed-charge coverage ratio, sometimes tested only when availability falls below a threshold, and limits on capital expenditures and distributions. The fixed-charge coverage test counts loan payments, lease payments and taxes against cash flow after maintenance capital expenditure, so an equipment purchase financed outside the agreement can trip a covenant inside it. Tell the asset-based lender before, not after, you finance a machine elsewhere.
EBITDA, cash flow and DSCR: the numbers lenders use to size your loan
How to compute EBITDA and debt service coverage from your own books, and how those numbers translate into a maximum loan amount.
Documents needed for business funding, by product
Exactly what to gather for an MCA, a term loan, a line of credit, equipment financing, factoring and an SBA loan, so the file closes in one pass.
Confessions of judgment, personal guarantees and UCC liens: what you are signing
The enforcement tools in alternative finance contracts, where they are banned, and what happens when a funder uses them.
Lenders in this sector have a short list of warning signs: receivables that age past 90 days with the largest customer, inventory that grows faster than sales, dilution rising because of quality disputes, tooling claimed as collateral that the customer actually owns, and a daily-debit advance appearing in the bank statements of a company that already has a blanket lien on its assets, which is both a default under the line and evidence that availability ran out. The typical mistake is using short-term unsecured products to fund a long production cycle because an asset-based line felt bureaucratic; the field exams and reporting are the price of advance rates and interest costs that no cash-flow product approaches.
Measure the cycle and the base
Compute cash conversion days and a borrowing base from your own aging and inventory; the number you can borrow is visible before any lender looks.
Separate equipment from working capital
Machines on PMSI equipment loans or 504; receivables and inventory on a line or factoring; never one blanket product for both.
Make ineligible collateral eligible
Insure export and concentrated receivables, clear old disputes, write off obsolete stock; each step raises availability.
Pre-clear big orders with the lender
An over-advance against a confirmed purchase order is routine when asked for in advance and a crisis when discovered.
Model covenants before capital expenditure
Run the fixed-charge coverage test with the new payment and the tax effect before signing the equipment quote.
Because a half-finished assembly has little or no liquidation value: it cannot be sold as raw material or as a finished product. Lenders advance against raw materials with a market and finished goods they could sell, and exclude the stage in between. Businesses with long production cycles cover that stage with customer deposits, supplier terms or a term loan.
Yes, through a purchase-money security interest limited to the machine, filed within the UCC window after delivery. The line's lender will usually require notice and may require the equipment lender to sign an intercreditor acknowledgment. What causes conflict is an equipment lender filing a blanket lien, which overlaps the line's collateral.
Dilution is the share of invoiced amounts that are never collected in cash because of returns, credits, discounts, disputes or write-offs. A lender measures it from your history and sets the advance rate so that collections still cover the loan after expected dilution. Rising dilution, often from quality problems, lowers the advance rate.
Through export credit insurance from EXIM or a private insurer, which makes the foreign receivable eligible for a borrowing base, through SBA's export working capital guarantees on lines used to fulfil foreign orders, or through letters of credit from the buyer's bank. Without one of these, most lenders exclude foreign receivables entirely.
Both. The program finances owner-occupied real estate and long-lived machinery and equipment, with the bank, a certified development company and the borrower sharing the cost. Small manufacturers qualify for a larger maximum debenture than other borrowers, which makes 504 a common route for a plant expansion that includes production equipment.
Equipment loan vs lease calculator
Total cost to own under a loan versus a lease with a buyout.
Invoice factoring cost calculator
Advance, fee, reserve and effective APR for one factored invoice.
DSCR calculator and maximum loan amount
Debt service coverage with a proposed loan, and the largest loan your cash flow supports.
Return on borrowed capital calculator
Does the extra profit justify the cost of the financing?
Updated October 12, 2026 · By Alternative Finance editorial team
Next step
Tell us a little about the business and we route the request to partners that fund your industry, size and credit profile. You compare the total payback and decide. Nothing is binding until you sign.
See what you may qualify for
Takes about a minute. Requesting offers does not affect your credit score. Free, no obligation.